Case Study

Bermuda Sports Club, Nuneaton

The existing sports facilities at the Bermuda sports ground were lost to housing and therefore replacement facilities were offered at an alternative adjacent site. As a result we were commissioned by Deeley Construction to construct a full size football pitch plus two bowling greens (one flat and one crown green) to the same specification as the originals, thereby ensuring replacement on a like-for-like basis as follows:

Football Pitch

  • Ripping and clearance of debris from the pitch formation.
  • Fine grading.
  • Installation of primary drainage.
  • Spreading of imported topsoil.
  • Cultivation and seeding.
  • Twelve months maintenance prior to practical completion.

Bowling Greens

  • Installation of full drainage scheme.
  • Installation of timber surrounds/gulleys.
  • Importation and spreading of granular drainage layer.
  • Importation and spreading of specialist rootzones.
  • Fine grading to levels/contours.
  • Supplying and laying of bowling green turf.
  • 12 months of maintenance prior to practical completion.